HIALEAH SR HIGH SCHOOL RENOVATIONS

Project Number: 01337800

 

BID DUE DATE: TBD

 

Contact:  Bill Conder, Director of Preconstruction, 954-343-5962

bconder@pirtleconstruction.com;

 

Bids Received: Pirtle Construction Company, 5700 Griffin Rd., Suite 200, Davie FL 33314 Attn: Bill Conder

 

Procurement Type: Construction Management at Risk

 

Location: 251 E 47th Street, Hialeah, FL 33013

 

Project Description:  The scope of work consists of the phased renovation of an existing two story High School building located in Hialeah Fl. Campus-wide renovations including resurfacing and striping of parking lots, drives and basketball courts; courtyard drainage corrections; new ESE bus drop-off and covered walkway; removal of portables; safety to life corrections; selective air conditioning and heating repair/replacement; selective electrical and lighting repair/replacement; selective re-roofing repair/replacement; selective exterior stucco wall repairs; selective exterior door/window repairs/replacement; selective interior door replacement; exterior painting; fire alarm replacement/corrections; public address system replacement; energy management system replacement; direct digital controls replacement; security alarm/surveillance system enhancements; renovations of the gym and locker rooms; selective renovation of toilet rooms and related plumbing repairs; selective flooring replacement; selective ceiling tile replacement; removal of boilers and conversion of rooms to storage; replacement of storage mezzanine structure; and demolition and replacement of flammable storage building.

 

Estimated Start Date: December 2015

 

Plans & Specs: Available on isqft.com to invited subcontractors – Date TBD

 

Bond Requirements: All bidders must include a separate rate for the Payment and Performance Bond premium on the Base Bid if the amount exceeds $50,000.  Pirtle Construction may institute a Subguard program on this project.  Additionally, Pirtle Construction will require each subcontractor whose proposal exceeds the above amount to provide their financial statements to confirm enrollment into the program.  Pirtle Construction reserves the right to request any subcontractor to obtain their own Payment and Performance Bond at the cost identified on the Bid Form if the enrollment is not approved.

 

M/WBE, SBE, LDB Particpation: MDCPS and Pirtle Construction encourage participation by certified SBE certified subcontractors. This project has established a participation goal of 25.8%

Additional Information: All subcontractors will be required to provide level 2 security screening for all onsite personnel. Jessica Lunsford’s Act.

 

Bid Packages: 021020 – Demolition, 030000 – Concrete, 062200 – Millwork & Cabinets, 075100 – Built-Up Roofing, 081000 – Metal Doors & Frames, 084000 – Windows Glazing & Storefront, 092000 – Framing, Drywall & Plaster, 093000 – Ceramic & Quarry Tile, 095100 – Acoustic Ceilings, 096500 – Resilient Flooring & Carpet, 96600 – Acoustical Wall Panels, 099000 – Painting, 100000 – Specialties, 101400 – Sports Equipment Signage, 116623 – Fire Extinguishers, 125100 – Fire Suppression, 220000 – Plumbing, 230000 – HVAC, 260000 – Electrical, 310000 – Earthwork & Paving, 329000 – Landscaping

 

 

Yes, I am pre-qualified and I am interested in receiving plans for this project.

For Pre-Qualification information please click here.